  • Darvoobrabotvane AD


    - Reconstruction and upgrade of burning utensils supply and montage of 2 steam boilers for prechamber burning of wooden chips , their capacity being 4 tons/hour each. Design and construction of boiler installation with capacity of 1 for burning of wooden wastes and supply of drying chambers.
  • Promishleni goriva EOOD


    - Montage of two boilers, BM 3.5 type for heavy duty oil. Reconstruction of two boilers BK4 type for burning sunflower seeds husks.
  • Zaharni zavodi AD


    - Construction of electrical filter and gas piping between the boilers of the Heat plants and the existing chimney. Execution of technical and economical analyses and development strategy for heat production plant of Zaharni Zavodi up to 2020. Investigating the status of energy equipment , operation of the boilers and turbines. Checking the chimney traction and operating solution for optimal operation of one and more than one steam generators. Reconstruction of heat supply. Investment project for replacement of turbogenerator No 1 in the heat plant.
  • Billa Nedvijimosti EOOD


    - gasification of boiler room .
  • Klisura Monastery St.St.Cyryl and Methodius


    - Construction of heating installation, water piping and boiler room in the building of Klisura Monastery.
  • Elprom Zem AD Sofia


    - Electrical steam boiler with max power 500 kV, 0,7 MPa, for technological purposes. Electrical water heating power 70 kV.
  • DUNAPACK RODINA AD


    - Construction of installation for industrial steam supply of a production line. Construction of boiler room on natural gas with 2 water heating boilers , 600 kV each and 1 steam boiler of 1000 kV for heating and industrial purposes. Construction of heating installation , external connections, water supply installation to sub-sites in corrugated plant. Construction of installation for supply of air heaters and air curtains for heating a production hall. Designing and construction of new boiler room. Construction of heating installation and subscribers station in the administrative building - department 1.
  • UBB AD


    - Repairing of boiler and heating installation in Belovo branch.
  • Gazterm OOD


    - Designing and construction of gas pipeline of SOMET LL OOD , Elin Pelin. Manufacturing of 60 gas measuring stations. Designing and construction of external gas pipeline and gasification of RPK-BKS Elin Pelin. Gasification of Cooperator Hotel. Gas station in V.Levski High School , Elin Pelin. Construction of external gas pipeline and gasification of boiler room of Radost Kindergarden , Elin Pelin. Construction of external gas pipeline and gasification of boiler room of Hristo Botev Primary School , Elin Pelin.
  • Electrorazpredelenie Sofia Region


    - Supply and montage of water heating boiler , reconstruction of O.I.
  • St. Ivan Rilski Hospital


    - manufacturing and montage of two electrical boilers 4 3 each . Designing and construction of a heating system from steam station to subscribers station. Construction of boiler installation , its electrical, water supply and sewerage and general supply segments and gasification. Optimization of steam heaters performance by spiral rolling pipes.
  • Sofia Municipality


    - Basic repair of water supply system and water supply and sewerage in 36th Kindergarten and D. Marinov Higher School , Iskar quarter, Sofia. Construction of boiler room in 60Th Kindergarten in Oborishte district. Repairs of water supply and sewerage system and boiler room in 62nd Kindergarten in Slatina district. Repair of heating installation in 49th Kindergarten in Izgrev district. Basic repair of heating installation in 135 Higher school in Krasna polyana district. Dismantling og the existing one, designing and construction of new heating installation with power of 600 kV in buildings of 124 Higher School , Poduene district. Basic repair of school buildings of 142 primary school , Krasno selo district. Replacement of boiler and repair of heating system, KIP and electrical boiler room of 124th Primary school in Poduene district. Basic repair of ventilation and cooling installation the gym of 73rd Higher School , Triadica district.
  • Samokov Municipality


    - Gasification and boiler installation in K Fotionov Higher school and St.St. Cyril and Methodius Primary School .
  • Gorna Oryahovitsa Municipality


    - Gasification of municipally funded sites. Designing and construction of gas boiler room and heating system in Napredak Community center , Gorna Oryahovitsa.
  • PUDOOS


    - Repair of speed heat exchanger to the incinerator for hospital wastes of the Medical academy.
  • Himremontstroy AD


    - Building and construction works on the cathode washing machine in UMICOR Med AD. Investigation, fault checking and replacement of fans for the Learmash AD main building . Dismantling of heavy oil and malt tanks in Learmash AD. New technological and electrical lines for Circulation circle I in Electrolytic Dept. in UMICCOR Med AD. Construction of new boiler room in the Hospital of Pirdop. Construction of boiler and heating system in the community house of the town of Pirdop.
  • Kraft Foods Bulgaria- Svoge


    - Contractual technical service of Instrumentation Control and Automatization of heating center with 2 boilers PKM 6,5 type.
  • Lyuben Karavelov Higher school of Civil Engineering (VSU) Sofia


    - Replacement of the heating system from the boiler room to the subscribers station of Block No 5. Assembly of of 2 new combined boilers, volume of 3 m3 for boiler hot water. Repair of 2 boilers for boiler hot water for Block No 4. Contractual service of Instrumenttion control and automatization of the heating center.
  • Filtex Bulgaria EOOD


    - Manufacturing, supply and assembly of electrical steam boiler with power 200 kV.
  • Letnitsa EOOD - the town of Letnitsa


    - Electrical steam boiler with max. power 400kV, 0,4 MPa for industrial purposes .
  • Asen Zlatarov Professional Higher School , Gorna Oryahovitsa


    - Designing and construction of gas pipeline, gas boiler room and heating system .
  • RPK Pavlikeni


    - Electrical steam boiler with max. power 150kV, 0,07 MPa for industrial purposes .
  • SAP EOOD - Sofia


    - Electrical steam boiler with max. power 150kV, 0,35 MPa for industrial purposes .
  • Kotlostroene JSCo


    - Designing and construction of gas pipeline and steam boiler room in Skladova tehnika AD , Gorna Oryahovitsa .
  • Energy Efficiency Consortium HIMREMONTSTROY AD


    - Construction of boiler and heating systems in the towns of Simeonovgrad, Pleven and Troyan .
  • Letnitsa EOOD


    - Manufacturing, supply and assembly of electrical steam boiler with power 400 kV.
  • SAVA MLADENOV Professional Higher school , Teteven


    - Supply and montage of KVN -1.0 boiler in steam center.
  • Cross International OOD


    - Living premises, Slatina district, 15A Kosta Lulchev Str. waste waters and water supply and sewerage and electrical installation. Construction and building works , heating and ventilation in a restaurant and a department store in Borovo district , Sofia with total covered area of 1200 sq.m. Living premises , Lozenets district, 15Vasil Kirkov - waste waters and water supply and sewerage and electrical installation. Office building, Ivan Vazov , Burel Str total built area 780 sq.m. - waste waters and water supply and sewerage and electrical installation. Repair works and modernization of Bolid printing center , Sofia- waste waters and water supply and sewerage and electrical installation. Reconstruction and modernization of Uper Factory, Rousse - waste waters and water supply and sewerage . Total reconstruction and modernization of Tintiava Sanatorium , Varshets - waste waters and water supply and sewerage .
  • Petko Petkov 24 EOOD


    - Assembly works on boiler chamber and recirculation system of Block 2 of Maritza East 3 .
  • Medikom EOOD


    - Basic repair of heat exchanger WTW 14 type to the incinerator for hospital wastes of the Military Medical Academy , Sofia .
  • Maritza Olio AD


    - Investigation and reconstruction in order t achieve a correct burning process of boiler for burning sunflower seeds husk .
  • Ministry of Education and Science


    - Construction of waste waters installation and boiler room of 1100 kV and its electrical , water supply and waste water systems in Ichko Boychev Higher technical school , Blagoevrgad. Dismantling of the existing one, designing and construction of new heating system of 550 kV in Building and Ebergy Higher technical School , Sofia.
  • ADIS EOOD


    - Repair works on the heating installations and electrical cabinets in boiler rooms and centers.
  • OPTEKO AND PARTNERS OOD


    - Construction of electrical boiler room and water cooling installation in workshop and offices. Reconstruction of a building in the phone plant in Sofia. Repairs on electrical, waste waters and water supply systems.
  • Elin Pelin Municipality -


    Gas supply station in Vasil Levski Primary School , Elin Pelin .Manufacturing and montage of gas measuring points.
  • VIK OOD Targovishte


    Construction of heating installation and gas boilers room with 2 water heating boilers 250 kV each for a tailoring workshop.
  • Sava Mladenov Professional Higher school , Teteven

    -
    Reconstruction of heating installation, manufacturing, supply and montage of water boiler , 2,53 for boiler hot water.
  • HEMUS AD


    - Manufacturing, supply and montage of steam boiler 4 tons/hours for burning of wooden chips in prechamber. Building an extension to the existing boiler room.
  • Elatsite Copper Mine AD


    - Repairs and processing of existing steam heating water boilers for boiler hot water, 2,5m3.
  • ITEM ENGINEERING AD


    - Designing and construction of heating installation and heavy oil boiler room of Aleko Hut . Construction of heating installation, repair of AC of Ariana lake.
  • Dr. STOYAN CHERKEZOV HOSPITAL, VELIKO TARNOVO


    - manufacturing, supply and montage of electrical steam boiler , 350kV.
  • Burgas Hlyab , Burgas


    - Electrical steam boiler with max. power 100 kV, 0,07 , steam output 100 kg/hour .
  • HIMIREX OOD Sevlievo


    - Electrical steam boiler with max. power 120 kV, 0,35 , steam otput 180 kg/hour for industrial purposes in workshops .
  • Bakery in the town of Radnevo

    - Electrical steam boiler with max. power 65 kV, 0,07 , steam otput 100 kg/hour.
  • Elektrorazpredelenie, the town of Kyustendil


    - Supply and montage of 2 electrical boilers 160kV each and their parallel connection to 2 heavy oil boilers in the boiler room.
  • Himremontstroy AD


    - Construction and montage works on cathode washing machine in UMICOR Med AD . Investigation, fault checking and replacement of fans for the Learmash AD main building . Dismantling of heavy oil and malt tanks in Learmash AD. New technological and electrical lines for Circulation circle I in Electrolytic Dept. in UMICCOR Med AD.
    - Construction of new boiler room in the Hospital of Pirdop. Construction of boiler and heating system in the community house of the town of Pirdop.
  • Hyundai Heavy Industries Bulgaria


    - Manufacturing, supply and montage of 2 electrical steam boilers 500 kV each for industrial purposes .
  • Obnova 2000 OOD


    - Heating installation of a boiler room in a flower stock , Drujba market.
  • Military Medical Academy


    - Designing and execution of external cable supply for EPK 400.
  • Metalsnab Holding AD


    - Manufacturing, supply and montage of electrical steam boiler 400 kV, 0,7MPa .
  • BG TERM OOD


    - Construction of waste waters installation at Kremikovtzi - Ore Mining Ltd. Construction of water supply and discharge and waste water installations on the site.
  • Gasstroymontaj AD

    Bankia
    - Designing and construction of boiler room on heavy oil for 370 kV in Ralitsa Hotel in Tryavna .
  • BNB


    - Manufacturing, supply and montage of boiler hot water installation with solar collectors in Ralitsa Holiday Home of BNB at Constantine and Elena Complex .
  • VLAD IMPEX OOD


    - Designing and construction of heavy oil boiler room, heating, water supply and discharge and electrical installation in family house in the village of Rudartsi.
  • DIARY OF T.KARAPETKOV SOFIA


    - Designing , montage and start- up of heavy oil steam boiler for heating and industrial purposes in a workshop for processed cheese.
  • ZEMUS OOD - Veliko Tarnovo


    - Installation of solar collectors for boiler hot water.
  • COLORA AD Svetovrachene


    - Designing and reconstruction of heating installation in a living premises to a production department and in a building comprising workshop and montage with boilers with power 48 kV and 72kV.
  • Marilin Hotel Sofia


    - Construction of boiler installation 2,5m3 for boiler hot water .
  • Ralitsa Hotel Tryavna


    - Designing and construction of boiler room 370 kV.
  • Metix OOD Petrich


    - Construction of heating installation in the administrative building .
  • Gasstroymontaj AD

    Bankia
    - Construction of water supply and discharge and waste waters installations.
  • JODI SOFIA


    - Montage of heating and ventilation installations in 9 blocks of flats of the company. Montage of boiling center fir feeding of the group boiler rooms of the 9 blocks of flats.
  • Building and Energy Higher Professional School, Sofia


    - Dismantling of the existing heating system, designing and construction of a new one of 550 kV.
  • Hyunday Ellprom Trafo OOD - Sofia


    - Electrical steam boilers with max. power 400 kV and 500 kV, 0,8 , steam otput 600 750 kg/hour for dryers
  • Assarel-Medet JSCo , Panagyurishte


    - 2 electrical steam boilers, , max.power 300 kV, 0,35 , steam output 450 kg/hour.